Smartjacks and support beam
The Gavanized smartJack and supplemental support beam are in place ready to be concreted.
Footing preparation
2'x2'x2' hole is dug to rpepare fort he engineered footing.
floor is opened
The concrete is remove so that the hole can be dug
Engineered footing
The Tamped gravel acts as a engineered footing to create the "Bulb of Influence"
Beam and jacks are installed an d adjusted
A beam is is put in place and the jacks are installed and adjusted up to support the floor.