
Floor is opened
The floor is opened up around the main sewer line exiting the home.

Line exposed
The main sewer line is exposed

Valve installed
The sewer line is cut and the valve is installed.

gravel added
Gravel is added before new concrete is added.

New concrete
The floor is restored back to original height with new concrete.