
LArge hole
A large hole is dug in the concrete to accept the oversized liner.

Pumps are installed
The three pumps are installed in the liner. Two pumps are running on AC household power and the third is DC running on large power cell.

Lid attached
The lid is attached and the floor is restored back to original height.

Battery added
The large battery is power cell is added and the discharge lines are attached.