Extension starts here
The old system from over 20 years ago is still working fine but the room that was not done has to be done.
trench opened
A Hilti jack hammer is used to open the floor along the perimeter.
Waterguard set in place
The Waterguard drainage system is installed in place and then back filled with stone.
Waterguard Ports
The crew foreman carefully sets the height of the Waterguard inspection ports.
Wall membrane and floor refinished
The Cleanspace wall membrane is installed and the floor is refinished back to the original height.
Job done
The area is cleaned and swept for debris and the foreman walks the customer through the finished product.