Builder pump
typical builder install. A corrugated liner with an open pit and no perforations to allow water from under the floor.
Liner removed and new liner in
The Triplesafe liner is larger than the builder pit. A larger hole is opened up in the floor and the liner is set in place.
Weepers added
The existing pit served to pump water from the exterior weeping tile. These weeper drains are added to new liner.
3 pumps are added
As you can see, three pumps are installed into the Triplesafe liner.
Two discharge lines.
The triplesafe features two discharge lines.
Floor restored
After the pumps are installed and the discharge lines are connected, The floor can be restored. The large 120amp hour battery sits on the floor.
Discharge with Iceguards
The two discharge lines have 2 Iceguards to protect the discharge from freezing. Frozen discharge lines are never a good thing for sump systems. The pumps will keep running and they will eventually burn out.