Dirt Floor
This dirt floor will emit moisture into the building envelope.
Moisture in the block
The perimeter blocks contain moisture that will rot the building materials
Leveling
Before the products are installed, some leveling is necessary
Drainage matting
A drainage matting goes down first. this will protect the Cleanspace.
Cleanspace vapor barrier.
The Cleanspace is now attached and sealed to the walls and posts.
Dehumidifier
A sanidry Sedona is installed to remove moisture from the air. THis will help the building materials and also make the air upstairs dryer and easier to heat and cool.
Duct
The duct work will circulate the dry air throughout the crawlspace.
