Earth exposed
This home had previously been encapsulated so a cut in the liner opens up the liner.
2x2x2 hole
A hole is dug for the footings
Engineered fill
Engineered fill is added to the hole as a footing. This fill will distribute the weight into the soil.
Aluminum base plate.
This 36" plate will also help distribute the weight.
Jack post installed
The jack post is installed and it is trued.
Magnetic level
a magnetic level is attached to make sure the Smartjack is true.
Adjustable top bracket
The top bracket is fully adjustable so that the floor can always stay stable.
Selaed up
because reducing moisture in the crawlspace, the Cleanspace liner is resealed against the Smartjacks.
