Blocks are drilled
The blocks on either side of the Carbon armor strap are drilled to allow the grout to be pumped in
Blocks filled
Reinforced grout is pumped into the cavities of the blocks
image.jpeg
image.jpeg
Carbon Armor is applied
The Carbon Armor strip is soaked with 2 part epoxy and cut to length to be applied to the wall
image.jpeg
image.jpeg
Armor Locks
A strip of carbon fibre is put through a buckle and the buckle is bolted to the joist header,
