Engineered footing
A cube of dirt is removed and filled with engineered fill.
Fully adjustable
The top of the jaxks are attached to the main beam with an adjustment threaded nob
floor re-concreted.
After the jacks are installed, the floor is restored.
fully installed
another view of the fully installed jacks
clean up
Omni Basement systems always cleans up after the job
