Wall prepared
The block wall is prepared by grinding the old paint off til you have a clean pores wall to adhere to.
Holes for grout
Holes are drilled in to the 4th block up to inject infused grout to solidify the wall
Grout
Grout is injected into the wall to solidify the bottom courses of blocks
Carbon fiber is appled.
The 7" wide strips pf carbon fiber are applied to the block wall and then epoxy is applied over top.
Armor lock
The wall is now tied into the joist floor system via armor locks
