
Leaking and Bowing
These old block walls have been leaking for a while.

some bowing
Some of the blocks are kinda rough

trench opened up
This trench will hold the drainage system.

Carbon Armor
The Carbon Armor is adhered to the wall.

Armor lock
The Armor lock attaches tot he header joist to secure the wall.

Delta MS added
As per the City of Hamilton, Delta MS is added tot he walls for a drainage membrane.

Re-concrete
The trench is then concreted back over again.

Discharge line
Although this was not our sump pump, we still upgraded the discharge line.

Iceguard.
The coupling next to the wall is called the Iceguard. This will prevent a frozen discharge line.