Concrete foundation
Before the work was done, the crew removed the finished wall
Trench opened
The trench was opened up and Waterguard was installed.
Floor restored
Once the Waterguard and the Cleanspace wall membrane are installed, the floor is installed.
Waterguard inspaection ports
This will allow inspection of the Waterguard anytime for the life of the home.
bright white finish
Even if Patricia does not finish her walls, she has a bright white finish.
Finished walls
This is one of the walls that was leaking.
