Concrete removed
Concrete area is removed so they can dig a whole.
Liner and lid installed
The Tuff Top lid is added temporarily to make sure they get the height right.
Pump and discharge line added
After the floor is re-concreted, the pumps can be added along with the discharge pipes.
Discharge line.
the discharge line is added along with the Iceguard to prevent a frozen discharge line.
