
Wall removal
The lower half the wall is removed so a membrane can be installed.

A trench is opened
A trench is opened up to install the Waterguard

Sump hole
the Supersump will be installed here at the end of the system.

Wall membrane
a Wall membrane is installed to drain any moisture down to the system.

Sump liner installed
The liner will house the Zoeller sump pump.

Hidden discharge line
The discharge line is cleverly hidden in the wall.

Tuff Top lid option
Pete opted for the Tuff Top lid so that it can be hidden under a floor or cabinet and the discharge is hidden too.

Gravel added to pit
After the Waterguard drainage system is installed, gravel is added to the trench for drainage.

Discharge with Iceguard.
The unusual looking coupling is called the Iceguard. it will prevent frozen discharge lines.